| Assessment Year | 1990 |
|---|---|
| Principal Product | CUSTOM THERMOFORMING |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
n/a
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $481,562 | 11,885,112 |
kWh
|
$0.041 |
| Natural Gas | $1,440 | 484 |
MMBtu
|
$2.98 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,975 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,714 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,537 | $16,218 |
$5,537
234,467
kWh
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $156 | - |
$306
12,896
kWh
|
$(-150.0) | |
| 03 | 2.2511: Insulate bare equipment | $3,218 | $2,838 |
$3,218
136,284
kWh
|
- | |
| 04 | 2.7261: Install timers and/or thermostats | $1,329 | $450 |
$1,329
56,272
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $724 | $564 |
$724
30,774
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $524 | $221 |
$524
22,274
kWh
|
- | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $7,368 | $700 |
$7,368
312,134
kWh
|
- | |
| 08 | 2.6218: Turn off equipment when not in use | $7,119 | - |
$7,119
223,916
kWh
|
- | |
| TOTAL RECOMMENDED | $25,975 | $20,991 |
$26,125
1,029,017
kWh
|
$(-150.0) | ||
| TOTAL IMPLEMENTED | $19,714 | $4,209 |
$19,864
763,776
kWh
|
$(-150.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs