ITAC Assessment: OK0330
ITAC logo
ITAC Assessment: OK0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CUSTOM THERMOFORMING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $481,562 11,885,112
kWh
Natural Gas $1,440 484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,537 $16,218 $5,537
234,467
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $156 - $306
12,896
kWh
$(-150.0)
03 2.2511: Insulate bare equipment $3,218 $2,838 $3,218
136,284
kWh
-
04 2.7261: Install timers and/or thermostats $1,329 $450 $1,329
56,272
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $724 $564 $724
30,774
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $524 $221 $524
22,274
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $7,368 $700 $7,368
312,134
kWh
-
08 2.6218: Turn off equipment when not in use $7,119 - $7,119
223,916
kWh
-
TOTAL RECOMMENDED $25,975 $20,991 $26,125
1,029,017
kWh
$(-150.0)
TOTAL IMPLEMENTED $19,714 $4,209 $19,864
763,776
kWh
$(-150.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs