ITAC Assessment: OK0329
ITAC logo
ITAC Assessment: OK0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product EXPANDABLE POLYSTYRENE
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range less than $500
k
# of Employees 12
Plant Area
n/a
Annual Production 1,300,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,422 167,057
kWh
Natural Gas $21,905 6,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1222: Install turbulators $536 $1,550 - $536
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $83 $57 $83
2,931
kWh
- -
03 2.6232: Install set-back timers $1,671 - $1,298
44,256
kWh
- $373
04 2.4239: Eliminate or reduce compressed air usage $290 - $290
9,965
kWh
- -
05 2.7261: Install timers and/or thermostats $2,363 $450 - $2,363
-
MMBtu
-
TOTAL RECOMMENDED $4,943 $2,057 $1,671
57,152
kWh
$2,899
-
MMBtu
$373
TOTAL IMPLEMENTED $4,407 $507 $1,671
57,152
kWh
$2,363
-
MMBtu
$373
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs