| Assessment Year | 1990 |
|---|---|
| Principal Product | AMMONIUM NITRATE |
| NAICS |
n/a
|
| SIC | 2873: Nitrogenous Fertilizers |
| Sales Range | $10 M to 50M |
| # of Employees | 107 |
| Plant Area |
n/a
|
| Annual Production | 88,000
ton
|
| Production Hrs. Annual | 8,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,026,528 | 104,422,041 |
kWh
|
$0.029 |
| Natural Gas | $1,856,169 | 1,007,848 |
MMBtu
|
$1.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $136,647 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,104 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2127: Flash condensate to produce lower pressure steam | $10,526 | $2,150 | - |
$10,526
-
MMBtu
|
- | |
| 02 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $2,335 | $5,076 | - |
$2,335
-
MMBtu
|
- | |
| 03 | 2.2441: Preheat boiler makeup water with waste process heat | $28,082 | $13,087 | - |
$28,082
-
MMBtu
|
- | |
| 04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $7,590 | $4,484 | - |
$7,590
-
MMBtu
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,932 | $3,700 |
$6,932
225,381
kWh
|
- | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $63,353 | $244,600 |
$63,353
3,000,000
kWh
|
- | - | |
| 07 | 2.6232: Install set-back timers | $1,894 | $650 |
$1,894
39,273
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,670 | $17,150 |
$7,297
206,624
kWh
|
- | $1,373 | |
| 09 | 2.7261: Install timers and/or thermostats | $232 | $440 | - |
$232
-
MMBtu
|
- | |
| 10 | 2.2511: Insulate bare equipment | $7,033 | $27,000 | - |
$7,033
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $136,647 | $318,337 |
$79,476
3,471,278
kWh
|
$55,798
-
MMBtu
|
$1,373 | ||
| TOTAL IMPLEMENTED | $56,104 | $36,737 |
$16,123
471,278
kWh
|
$38,608
-
MMBtu
|
$1,373 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs