ITAC Assessment: OK0327
ITAC logo
ITAC Assessment: OK0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AMMONIUM NITRATE
NAICS
n/a
SIC 2873: Nitrogenous Fertilizers
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area
n/a
Annual Production 88,000
ton
Production Hrs. Annual 8,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,026,528 104,422,041
kWh
Natural Gas $1,856,169 1,007,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2127: Flash condensate to produce lower pressure steam $10,526 $2,150 - $10,526
-
MMBtu
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $2,335 $5,076 - $2,335
-
MMBtu
-
03 2.2441: Preheat boiler makeup water with waste process heat $28,082 $13,087 - $28,082
-
MMBtu
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $7,590 $4,484 - $7,590
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,932 $3,700 $6,932
225,381
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $63,353 $244,600 $63,353
3,000,000
kWh
- -
07 2.6232: Install set-back timers $1,894 $650 $1,894
39,273
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $8,670 $17,150 $7,297
206,624
kWh
- $1,373
09 2.7261: Install timers and/or thermostats $232 $440 - $232
-
MMBtu
-
10 2.2511: Insulate bare equipment $7,033 $27,000 - $7,033
-
MMBtu
-
TOTAL RECOMMENDED $136,647 $318,337 $79,476
3,471,278
kWh
$55,798
-
MMBtu
$1,373
TOTAL IMPLEMENTED $56,104 $36,737 $16,123
471,278
kWh
$38,608
-
MMBtu
$1,373
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs