ITAC Assessment: OK0319
ITAC logo
ITAC Assessment: OK0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AUTO ENGINES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,357 6,325,909
kWh
Natural Gas $144,069 55,119
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,229

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,141 $5,687 $12,141
266,999
kWh
-
02 2.2437: Recover waste heat from equipment $4,868 $2,380 - $4,868
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $59 - $59
1,758
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,179 - $6,179
136,577
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,512 - $9,512
298,066
kWh
-
06 2.7261: Install timers and/or thermostats $708 $900 - $708
-
MMBtu
TOTAL RECOMMENDED $33,467 $8,967 $27,891
703,400
kWh
$5,576
-
MMBtu
TOTAL IMPLEMENTED $27,229 $8,967 $21,653
565,065
kWh
$5,576
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs