ITAC Assessment: SD0430
ITAC logo
ITAC Assessment: SD0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Folding Carton Packaging and Blister Cards
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 141
Plant Area 70,000
ft2
Annual Production 24,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,387 2,190,880
kWh
Electricity Demand $17,430 5,410
kW-mo/yr
Electricity Fees $15,377 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $264 - $264
3,427
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,152 $100 $1,152
14,978
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,949 $800 $2,949
38,350
kWh
-
04 2.7135: Install occupancy sensors $1,126 $1,029 $1,126
14,645
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,250 $1,671 $1,180
15,354
kWh
$70
-
kW-mo/yr
TOTAL RECOMMENDED $6,741 $3,600 $6,671
86,754
kWh
$70
-
kW-mo/yr
TOTAL IMPLEMENTED $2,949 $800 $2,949
38,350
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs