ITAC Assessment: MS0475
ITAC logo
ITAC Assessment: MS0475
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Vehicle seat frames, seat cushions, interior door panels, arm rests
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 328
Plant Area 420,000
ft2
Annual Production 177,336
units
Production Hrs. Annual 6,456
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $849,789 9,955,200
kWh
Electricity Demand $337,313 21,869
kW-mo/yr
Electricity Fees $5,808 -
Natural Gas $34,162 2,455
MMBtu
Waste Disposal Costs
Water Usage $9,630 1,877
Tgal
Water Disposal $9,630 1,871
Tgal
TOTAL YEARLY COSTS $1,246,332
RECOMMENDED SAVINGS* $165,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,850 $16,500 $1,850
21,760
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,606 $4,076 $5,606
65,950
kWh
-
03 2.2437: Recover waste heat from equipment $12,942 $7,943 $12,942
152,263
kWh
-
04 2.7135: Install occupancy sensors $7,543 $4,022 $7,543
88,738
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $15,275 $18,599 $14,545
171,119
kWh
$730
-
kW-mo/yr
06 2.4221: Install compressor air intakes in coolest locations $1,167 $1,153 $1,167
13,728
kWh
-
07 2.8117: Install sub-metering equipment $98,081 $934 $81,219
955,520
kWh
$16,862
-
kW-mo/yr
08 2.6218: Turn off equipment when not in use $17,316 - $17,316
203,716
kWh
-
09 2.6125: Keep equipment clean $5,606 - $5,606
65,950
kWh
-
TOTAL RECOMMENDED $165,386 $53,227 $147,794
1,738,744
kWh
$17,592
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs