Assessment Year | 1990 |
---|---|
Principal Product | AMUSEMENT RIDE EQUIPMENT |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
n/a
|
Annual Production | 132
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $220,424 | 2,751,172 |
kWh
|
$0.080 |
Natural Gas | $73,002 | 23,625 |
MMBtu
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,256 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,239 | $2,150 |
$1,538
21,395
kWh
|
$1,701
-
MMBtu
|
- | |
02 | 2.7261: Install timers and/or thermostats | $2,549 | $750 | - |
$2,549
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $2,942 | $1,641 | - |
$2,942
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $578 | $190 |
$578
8,206
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,396 | - |
$2,546
35,463
kWh
|
- | $(-150.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,283 | $632 |
$1,283
14,361
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,494 | $975 |
$1,525
16,999
kWh
|
- | $(-31.0) | |
TOTAL RECOMMENDED | $14,481 | $6,338 |
$7,470
96,424
kWh
|
$7,192
-
MMBtu
|
$(-181.0) | ||
TOTAL IMPLEMENTED | $10,256 | $4,065 |
$6,187
82,063
kWh
|
$4,250
-
MMBtu
|
$(-181.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs