Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AMUSEMENT RIDE EQUIPMENT
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 132
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $220,424 2,751,172
kWh
Natural Gas $73,002 23,625
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,256

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,239 $2,150 $1,538
21,395
kWh
$1,701
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $2,549 $750 - $2,549
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $2,942 $1,641 - $2,942
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $578 $190 $578
8,206
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,396 - $2,546
35,463
kWh
- $(-150.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,283 $632 $1,283
14,361
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,494 $975 $1,525
16,999
kWh
- $(-31.0)
TOTAL RECOMMENDED $14,481 $6,338 $7,470
96,424
kWh
$7,192
-
MMBtu
$(-181.0)
TOTAL IMPLEMENTED $10,256 $4,065 $6,187
82,063
kWh
$4,250
-
MMBtu
$(-181.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs