ITAC Assessment: UD0231
ITAC logo
ITAC Assessment: UD0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INJECTION MOLDED PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 1,800
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,839 1,056,858
kWh
Natural Gas $6,686 1,292
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,055

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $644 $3,000 $(-454.0)
(-7,620)
kWh
$1,098
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,469 $1,070 $2,411
50,117
kWh
$(-140.0)
-
MMBtu
$198
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,586 - $1,586
7,034
kWh
- -
TOTAL RECOMMENDED $4,699 $4,070 $3,543
49,531
kWh
$958
-
MMBtu
$198
TOTAL IMPLEMENTED $4,055 $1,070 $3,997
57,151
kWh
$(-140.0)
-
MMBtu
$198
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs