ITAC Assessment: OK0277
ITAC logo
ITAC Assessment: OK0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product BREAD & BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 80,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,461 5,789,859
kWh
Natural Gas $136,423 40,775
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2123: Insulate feedwater tank $344 $212 - $344
-
MMBtu
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,470 $775 - $4,470
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,198 $1,500 - $2,198
-
MMBtu
04 2.3212: Optimize plant power factor $1,069 $3,000 $1,069
-
kWh
-
05 2.2437: Recover waste heat from equipment $8,135 $18,000 $(-70.0)
(-2,345)
kWh
$8,205
-
MMBtu
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $4,340 $12,000 $4,340
111,958
kWh
-
07 2.7261: Install timers and/or thermostats $2,801 $250 - $2,801
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,430 $834 $3,430
84,115
kWh
-
09 2.6232: Install set-back timers $1,149 $1,440 $1,149
36,928
kWh
-
10 2.3511: Use plant owned transformers or lease transformers $10,418 $3,100 $10,418
-
kWh
-
TOTAL RECOMMENDED $38,354 $41,111 $20,336
230,656
kWh
$18,018
-
MMBtu
TOTAL IMPLEMENTED $10,312 $14,546 $7,770
196,073
kWh
$2,542
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs