ITAC Assessment: OK0274
ITAC logo
ITAC Assessment: OK0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product STAINLESS STEEL TUBINGS
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area
n/a
Annual Production 3,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,693 7,551,583
kWh
Natural Gas $12,327 3,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $544 $350 - $544
-
MMBtu
02 2.2511: Insulate bare equipment $6,510 $1,958 $6,510
162,954
kWh
-
03 2.2511: Insulate bare equipment $23,241 $3,556 $23,241
582,063
kWh
-
04 2.2514: Cover open tanks $11,365 $1,986 $11,365
284,291
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,511 $15,480 $18,511
463,365
kWh
-
06 2.7446: Utilize sensors controlling roof and wall openings $2,113 $1,925 $2,113
79,426
kWh
-
07 2.2443: Re-use or recycle hot or cold process exhaust air $5,496 $6,200 $(-219.0)
(-5,569)
kWh
$5,715
-
MMBtu
TOTAL RECOMMENDED $67,780 $31,455 $61,521
1,566,530
kWh
$6,259
-
MMBtu
TOTAL IMPLEMENTED $25,898 $5,831 $25,354
661,489
kWh
$544
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs