ITAC Assessment: OK0263
ITAC logo
ITAC Assessment: OK0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product VARIOUS TYPES CARTS
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 455
Plant Area
n/a
Annual Production 600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $589,004 13,131,888
kWh
Natural Gas $130,932 45,919
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $23,899 - $23,899
1,052,755
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $744 - $744
13,482
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $642 $668 $642
28,429
kWh
-
04 2.2437: Recover waste heat from equipment $4,850 $1,482 - $4,850
-
MMBtu
05 2.2424: Use heat in flue gases to preheat products or materials $9,674 $10,000 - $9,674
-
MMBtu
06 2.6232: Install set-back timers $1,585 - $1,585
19,343
kWh
-
07 2.2511: Insulate bare equipment $585 $396 - $585
-
MMBtu
TOTAL RECOMMENDED $41,979 $12,546 $26,870
1,114,009
kWh
$15,109
-
MMBtu
TOTAL IMPLEMENTED $25,484 - $25,484
1,072,098
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs