ITAC Assessment: OK0237
ITAC logo
ITAC Assessment: OK0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ARCHITECTURAL METALS
NAICS
n/a
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,442 1,024,033
kWh
Natural Gas $29,050 6,940
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,860 - $4,860
-
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,416 $30,755 $12,334
182,298
kWh
- $82
03 2.4133: Use most efficient type of electric motors $118 - $118
879
kWh
- -
04 2.6232: Install set-back timers $216 - $216
3,224
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $179 $110 $197
2,638
kWh
$(-18.0)
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,055 $110 $1,055
33,998
kWh
- -
07 2.7261: Install timers and/or thermostats $452 $600 - $452
-
MMBtu
-
TOTAL RECOMMENDED $19,296 $31,575 $18,780
223,037
kWh
$434
-
MMBtu
$82
TOTAL IMPLEMENTED $6,428 $220 $6,446
40,739
kWh
$(-18.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs