ITAC Assessment: UA0100
ITAC logo
ITAC Assessment: UA0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Rosin Based Agents
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 16
Plant Area 21,500
ft2
Annual Production 45,000,000
units
Production Hrs. Annual 5,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,779 1,276,690
kWh
Electricity Fees $8,996 -
Natural Gas $166,892 33,211
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $6,757 $1,062 $6,385
62,334
kWh
$372 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,852 $11,493 $6,475
59,720
kWh
$377 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,332 $1,800 $1,259
12,289
kWh
$73 -
04 2.2136: Install / repair insulation on steam lines $70 $43 - - $70
-
MMBtu
TOTAL RECOMMENDED $15,011 $14,398 $14,119
134,343
kWh
$822 $70
-
MMBtu
TOTAL IMPLEMENTED $8,159 $2,905 $7,644
74,623
kWh
$445 $70
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs