ITAC Assessment: UF0172
ITAC logo
ITAC Assessment: UF0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Corrugated Containers
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 125,000
ft2
Annual Production 75,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,532 4,284,877
kWh
Electricity Demand $39,605 10,290
kW-mo/yr
Fuel Oil #4 $114,815 28,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $937,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.7145: Install skylights $3,663 $2,400 $3,663
89,390
kWh
- - - - - -
02 2.4133: Use most efficient type of electric motors $1,225 $1,311 $1,137
27,843
kWh
$88
-
kW-mo/yr
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,870 $1,050 $3,870
84,115
kWh
- - - - - -
04 2.2135: Repair and eliminate steam leaks $2,570 $625 - - $2,570
-
MMBtu
- - - -
05 3.5316: Contract a wood pallet recycling company $3,600 - - - - $3,600
-
lb
- - -
06 3.6192: Use a less expensive method of waste removal $1,320 - - - - - - $1,320 -
07 4.111: Add equipment/ operators to reduce production bottleneck $921,346 $1,400,000 - - - - $(-1,578,654.0) - $2,500,000
TOTAL RECOMMENDED $937,594 $1,405,386 $8,670
201,348
kWh
$88
-
kW-mo/yr
$2,570
-
MMBtu
$3,600
-
lb
$(-1,578,654.0) $1,320 $2,500,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs