ITAC Assessment: OK0234
ITAC logo
ITAC Assessment: OK0234
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INJECTION MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 176
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,926 5,730,070
kWh
Natural Gas $5,312 1,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,956 $210 $1,612
36,049
kWh
- $344
02 2.6232: Install set-back timers $4,799 - $3,695
101,407
kWh
- $1,104
03 2.7142: Utilize higher efficiency lamps and/or ballasts $955 $1,920 $717
19,637
kWh
- $238
04 2.7142: Utilize higher efficiency lamps and/or ballasts $703 $81 $709
15,533
kWh
$(-6.0)
-
MMBtu
-
05 2.3212: Optimize plant power factor $5,881 $10,000 $5,881
-
kWh
- -
06 2.7261: Install timers and/or thermostats $86 $170 - $86
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,006 $2,458 $1,006
19,343
kWh
- -
TOTAL RECOMMENDED $15,386 $14,839 $13,620
191,969
kWh
$80
-
MMBtu
$1,686
TOTAL IMPLEMENTED $9,632 $12,919 $9,208
70,925
kWh
$80
-
MMBtu
$344
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs