ITAC Assessment: OK0126
ITAC logo
ITAC Assessment: OK0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PUMPS & VALVES
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 280
Plant Area
n/a
Annual Production 9,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,253 2,644,490
kWh
Natural Gas $58,216 16,386
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,833 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,833

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,155 $535 - $1,155
-
MMBtu
02 2.2437: Recover waste heat from equipment $153 $211 - $153
-
MMBtu
03 2.7314: Reduce ventilation air $1,502 $12 $124
4,103
kWh
$1,378
-
MMBtu
04 2.2437: Recover waste heat from equipment $253 $365 - $253
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,231 $1,913 $1,231
24,619
kWh
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,416 $704 $1,416
37,222
kWh
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $123 $36 $123
2,345
kWh
-
TOTAL RECOMMENDED $5,833 $3,776 $2,894
68,289
kWh
$2,939
-
MMBtu
TOTAL IMPLEMENTED $5,833 $3,776 $2,894
68,289
kWh
$2,939
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs