Assessment Year | 1984 |
---|---|
Principal Product | PUMPS & VALVES |
NAICS |
n/a
|
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 280 |
Plant Area |
n/a
|
Annual Production | 9,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,253 | 2,644,490 |
kWh
|
$0.050 |
Natural Gas | $58,216 | 16,386 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,833 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,155 | $535 | - |
$1,155
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $153 | $211 | - |
$153
-
MMBtu
|
|
03 | 2.7314: Reduce ventilation air | $1,502 | $12 |
$124
4,103
kWh
|
$1,378
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $253 | $365 | - |
$253
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,231 | $1,913 |
$1,231
24,619
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,416 | $704 |
$1,416
37,222
kWh
|
- | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $123 | $36 |
$123
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $5,833 | $3,776 |
$2,894
68,289
kWh
|
$2,939
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,833 | $3,776 |
$2,894
68,289
kWh
|
$2,939
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs