ITAC Assessment: OK0180
ITAC logo
ITAC Assessment: OK0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product NATURAL GAS COMPRESSORS
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,680
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,960 2,800,117
kWh
Natural Gas $76,290 20,198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $565 $120 $565
19,930
kWh
- -
02 2.7261: Install timers and/or thermostats $1,599 $2,100 - $1,599
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $579 - $579
11,723
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $781 $186 $781
16,120
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $4,770 $4,400 - $4,770
-
MMBtu
-
06 2.4322: Use or replace with energy efficient substitutes $3,695 $2,100 $3,695
72,098
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,381 $29,961 $9,118
236,225
kWh
- $263
TOTAL RECOMMENDED $21,370 $38,867 $14,738
356,096
kWh
$6,369
-
MMBtu
$263
TOTAL IMPLEMENTED $21,370 $38,867 $14,738
356,096
kWh
$6,369
-
MMBtu
$263
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs