ITAC Assessment: HO0210
ITAC logo
ITAC Assessment: HO0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Sport Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 900,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,888
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,415 5,995,018
kWh
Electricity Demand $74,789 12,004
kW-mo/yr
Electricity Fees $(-43,259.0) -
Natural Gas $338,252 111,021
MMBtu
Fuel Oil #4 $14,234 2,669
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,153 $13,162 $4,032
78,546
kWh
$1,121
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $22,250 $28,000 $22,250
432,298
kWh
- - - - -
03 2.7111: Reduce illumination to minimum necessary levels $26,892 $1,200 $22,199
432,591
kWh
$4,693
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $2,850 $3,667 $2,850
223,623
kWh
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,190 $1,500 $2,635
51,290
kWh
$555
-
kW-mo/yr
- - - -
06 2.2414: Use waste heat from hot flue gases to preheat $50,969 $43,100 - - $50,969
-
MMBtu
- - -
07 4.632: Change operating conditions $15,421 $500 - - - - - $15,421
08 4.111: Add equipment/ operators to reduce production bottleneck $1,740 $180 - - - - - $1,740
09 3.7211: Modify material application methods $13,353 - - - - - $13,353
-
gal
-
10 3.7214: Reduce or eliminate waste $29,674 $5,000 - - - - $29,674
-
gal
-
11 3.7223: Install shrouding on machines to prevent splashing $15,834 $6,000 - - - $15,834
-
Tgal
- -
TOTAL RECOMMENDED $187,326 $102,309 $53,966
1,218,348
kWh
$6,369
-
kW-mo/yr
$50,969
-
MMBtu
$15,834
-
Tgal
$43,027
-
gal
$17,161
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs