ITAC Assessment: OK0178
ITAC logo
ITAC Assessment: OK0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLATED & ANODIZED METAL
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,420
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,631 917,644
kWh
Natural Gas $54,834 14,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $2,258 $800 - $2,318
-
MMBtu
- $(-60.0)
02 2.2414: Use waste heat from hot flue gases to preheat $1,524 $4,000 - $1,524
-
MMBtu
- -
03 2.7231: Use radiant heater for spot heating $1,400 $2,120 - $2,099
-
MMBtu
$(-699.0)
-
MMBtu
-
04 2.7261: Install timers and/or thermostats $178 $150 - $178
-
MMBtu
- -
05 2.2514: Cover open tanks $5,600 $9,888 - $5,600
-
MMBtu
- -
06 2.2511: Insulate bare equipment $1,732 $636 - $1,732
-
MMBtu
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $244 $200 $244
3,810
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $64 $55 $64
1,758
kWh
- - -
09 2.3212: Optimize plant power factor $528 $1,795 $528
-
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $579 $250 $579
9,965
kWh
- - -
TOTAL RECOMMENDED $14,107 $19,894 $1,415
15,533
kWh
$13,451
-
MMBtu
$(-699.0)
-
MMBtu
$(-60.0)
TOTAL IMPLEMENTED $3,989 $6,775 $887
15,533
kWh
$3,801
-
MMBtu
$(-699.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings