Assessment Year | 1985 |
---|---|
Principal Product | PLATED & ANODIZED METAL |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 62 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,631 | 917,644 |
kWh
|
$0.056 |
Natural Gas | $54,834 | 14,410 |
MMBtu
|
$3.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,107 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,989 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,258 | $800 | - |
$2,318
-
MMBtu
|
- | $(-60.0) | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $1,524 | $4,000 | - |
$1,524
-
MMBtu
|
- | - | |
03 | 2.7231: Use radiant heater for spot heating | $1,400 | $2,120 | - |
$2,099
-
MMBtu
|
$(-699.0)
-
MMBtu
|
- | |
04 | 2.7261: Install timers and/or thermostats | $178 | $150 | - |
$178
-
MMBtu
|
- | - | |
05 | 2.2514: Cover open tanks | $5,600 | $9,888 | - |
$5,600
-
MMBtu
|
- | - | |
06 | 2.2511: Insulate bare equipment | $1,732 | $636 | - |
$1,732
-
MMBtu
|
- | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $244 | $200 |
$244
3,810
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $64 | $55 |
$64
1,758
kWh
|
- | - | - | |
09 | 2.3212: Optimize plant power factor | $528 | $1,795 |
$528
-
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $579 | $250 |
$579
9,965
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $14,107 | $19,894 |
$1,415
15,533
kWh
|
$13,451
-
MMBtu
|
$(-699.0)
-
MMBtu
|
$(-60.0) | ||
TOTAL IMPLEMENTED | $3,989 | $6,775 |
$887
15,533
kWh
|
$3,801
-
MMBtu
|
$(-699.0)
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs