Assessment Year | 2011 |
---|---|
Principal Product | cuttlery |
NAICS | 332215: Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing |
SIC | 3421: Cutlery |
Sales Range | $10 M to 50M |
# of Employees | 246 |
Plant Area |
250,000
ft2
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $335,704 | 3,102,760 |
kWh
|
$0.11 |
Electricity Demand | $123,324 | 13,348 |
kW-mo/yr
|
$9.24 |
Natural Gas | $165,874 | 15,540 |
MMBtu
|
$10.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,256 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $9,048 | $2,585 |
$1,918
17,766
kWh
|
$7,130
-
MMBtu
|
|
02 | 2.4224: Upgrade controls on compressors | $4,053 | $200 |
$4,053
37,526
kWh
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,514 | $5,967 |
$426
3,950
kWh
|
$1,088
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,225 | $200 |
$1,225
11,347
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $912 | $8,300 |
$912
8,451
kWh
|
- | |
06 | 2.1116: Improve combustion control capability | $362 | $500 | - |
$362
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $107 | $100 | - |
$107
-
MMBtu
|
|
TOTAL RECOMMENDED | $17,221 | $17,852 |
$8,534
79,040
kWh
|
$8,687
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,256 | $9,352 |
$3,569
33,063
kWh
|
$8,687
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs