ITAC Assessment: OK0175
ITAC logo
ITAC Assessment: OK0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product INSTRUMENT PANELBOARDS
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $5
M
to 10
M
# of Employees 140
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,291 1,936,694
kWh
Natural Gas $6,641 1,755
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,926 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $678 $1,252 $678
12,016
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,344 $3,461 $6,612
140,680
kWh
$(-2,268.0)
-
MMBtu
03 2.7261: Install timers and/or thermostats $748 $400 - $748
-
MMBtu
04 2.3191: Use demand controller or load shedder $1,056 $330 $1,056
-
kWh
-
05 2.7251: Reduce air conditioning load by evaporating water from roof $1,954 $4,000 $1,954
49,824
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,146 $35,020 $7,146
157,093
kWh
-
TOTAL RECOMMENDED $15,926 $44,463 $17,446
359,613
kWh
$(-1,520.0)
-
MMBtu
TOTAL IMPLEMENTED $3,380 $5,652 $2,632
61,840
kWh
$748
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs