ITAC Assessment: OK0168
ITAC logo
ITAC Assessment: OK0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product CUSTOM MOLDED RUBBER & PLASTIC
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 650,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,320 4,327,081
kWh
Natural Gas $137,793 37,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $317 $200 - $317
-
MMBtu
-
02 2.3212: Optimize plant power factor $3,024 $9,555 $3,024
-
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $831 $140 $831
26,377
kWh
- -
04 2.2135: Repair and eliminate steam leaks $9,402 $350 - $9,187
-
MMBtu
$215
05 2.2437: Recover waste heat from equipment $358 $468 - $358
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $236 $126 $236
7,620
kWh
- -
07 2.4133: Use most efficient type of electric motors $595 $760 $595
14,361
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $3,254 $648 $3,254
83,236
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,999 $1,400 $1,999
49,238
kWh
- -
10 2.2414: Use waste heat from hot flue gases to preheat $3,246 $8,400 - $3,246
-
MMBtu
-
TOTAL RECOMMENDED $23,262 $22,047 $9,939
180,832
kWh
$13,108
-
MMBtu
$215
TOTAL IMPLEMENTED $13,738 $3,444 $3,661
97,596
kWh
$9,862
-
MMBtu
$215
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs