ITAC Assessment: OK0162
ITAC logo
ITAC Assessment: OK0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product WELDED FITTINGS
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 63
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,890 2,084,408
kWh
Natural Gas $301,549 85,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $6,361 $1,022 - $6,361
-
MMBtu
02 2.3212: Optimize plant power factor $900 $2,355 $900
-
kWh
-
03 2.2136: Install / repair insulation on steam lines $799 $400 - $799
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $146 $310 - $146
-
MMBtu
05 2.5194: Redesign process $529 $33 - $529
-
MMBtu
06 2.2414: Use waste heat from hot flue gases to preheat $4,273 $10,000 - $4,273
-
MMBtu
TOTAL RECOMMENDED $13,008 $14,120 $900
-
kWh
$12,108
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs