ITAC Assessment: OK0154
ITAC logo
ITAC Assessment: OK0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product REFRIGERANTS
NAICS
n/a
SIC 2813: Industrial Gases
Sales Range $50
M
to 100
M
# of Employees 45
Plant Area
n/a
Annual Production 48,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $672,927 15,669,989
kWh
Other Energy $635,005 141,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $989,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $987,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Administrative Changes Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $13,315 $12,158 $(-85.0)
(-2,052)
kWh
$13,400
-
MMBtu
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,917 $500 - $1,917
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $850 - $850
13,482
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,201 $546 $1,201
19,050
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $661 $1,142 $614
15,826
kWh
- $47
06 2.7111: Reduce illumination to minimum necessary levels $1,402 $410 $1,402
24,912
kWh
- -
07 2.4133: Use most efficient type of electric motors $1,382 $891 $1,382
35,463
kWh
- -
08 2.7261: Install timers and/or thermostats $4,324 $171 $424
16,413
kWh
$3,900
-
MMBtu
-
09 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $4,309 $13,674 $7,218
206,917
kWh
$(-2,909.0)
-
MMBtu
-
10 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $959,738 $1,018,080 $408,620
14,886,577
kWh
$603,255
-
MMBtu
$(-52,137.0)
TOTAL RECOMMENDED $989,099 $1,047,572 $421,626
15,216,588
kWh
$619,563
-
MMBtu
$(-52,090.0)
TOTAL IMPLEMENTED $987,048 $1,047,026 $419,575
15,184,056
kWh
$619,563
-
MMBtu
$(-52,090.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs