ITAC Assessment: IA0208
ITAC logo
ITAC Assessment: IA0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product custom livestock and snowmobile trailers
NAICS
n/a
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 80,000
ft2
Annual Production 3,300
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,993 1,024,033
kWh
Electricity Demand $12,702 3,720
kW-mo/yr
Natural Gas $42,207 9,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $245,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $244,563

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,845 $495 $3,815
153,869
kWh
$1,030
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $4,757 - $4,757
191,970
kWh
- - - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,597 $50 $1,257
50,703
kWh
$340
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $1,092 $1,250 $1,092
43,962
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $187 $434 $99
4,103
kWh
$88
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $47 $92 $23
879
kWh
$24
-
kW-mo/yr
- - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $74,010 $2,000 - - $6,308
-
lb
- $67,702
08 3.7214: Reduce or eliminate waste $159,120 $82,800 - - - $159,120 -
TOTAL RECOMMENDED $245,655 $87,121 $11,043
445,486
kWh
$1,482
-
kW-mo/yr
$6,308
-
lb
$159,120 $67,702
TOTAL IMPLEMENTED $244,563 $85,871 $9,951
401,524
kWh
$1,482
-
kW-mo/yr
$6,308
-
lb
$159,120 $67,702
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs