Assessment Year | 1998 |
---|---|
Principal Product | custom livestock and snowmobile trailers |
NAICS |
n/a
|
SIC | 3799: Transportation Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
80,000
ft2
|
Annual Production | 3,300
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $35,993 | 1,024,033 |
kWh
|
$0.035 |
Electricity Demand | $12,702 | 3,720 |
kW-mo/yr
|
$3.41 |
Natural Gas | $42,207 | 9,809 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $245,655 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $244,563 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,845 | $495 |
$3,815
153,869
kWh
|
$1,030
-
kW-mo/yr
|
- | - | - | |
02 | 2.6218: Turn off equipment when not in use | $4,757 | - |
$4,757
191,970
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,597 | $50 |
$1,257
50,703
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $1,092 | $1,250 |
$1,092
43,962
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $187 | $434 |
$99
4,103
kWh
|
$88
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $47 | $92 |
$23
879
kWh
|
$24
-
kW-mo/yr
|
- | - | - | |
07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $74,010 | $2,000 | - | - |
$6,308
-
lb
|
- | $67,702 | |
08 | 3.7214: Reduce or eliminate waste | $159,120 | $82,800 | - | - | - | $159,120 | - | |
TOTAL RECOMMENDED | $245,655 | $87,121 |
$11,043
445,486
kWh
|
$1,482
-
kW-mo/yr
|
$6,308
-
lb
|
$159,120 | $67,702 | ||
TOTAL IMPLEMENTED | $244,563 | $85,871 |
$9,951
401,524
kWh
|
$1,482
-
kW-mo/yr
|
$6,308
-
lb
|
$159,120 | $67,702 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs