ITAC Assessment: OR0359
ITAC logo
ITAC Assessment: OR0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fish, crab, shrimp
NAICS
n/a
SIC 2092: Prepared Fresh or Frozen Fish and Seafoods
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 30,000
ft2
Annual Production 18,200,000
lb
Production Hrs. Annual 2,032
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,750 1,716,882
kWh
Electricity Demand $14,269 5,244
kW-mo/yr
Electricity Fees $9,483 -
Natural Gas $29,255 6,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,013

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $80,000 $95,000 - - - $90,000 $(-10,000.0)
02 2.2621: Modify refrigeration system to operate at a lower pressure $2,013 - $2,013
60,375
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,648 $9,500 $3,197
34,584
kWh
$451
-
kW-mo/yr
- - -
04 2.3212: Optimize plant power factor $786 $2,200 - - $786 - -
05 2.8112: Combine utility meters $1,851 $10,000 - - $1,851 - -
TOTAL RECOMMENDED $88,298 $116,700 $5,210
94,959
kWh
$451
-
kW-mo/yr
$2,637 $90,000 $(-10,000.0)
TOTAL IMPLEMENTED $2,013 - $2,013
60,375
kWh
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs