Assessment Year | 2024 |
---|---|
Principal Product | waste water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 103 |
Plant Area |
2,257,403
ft2
|
Annual Production | 30,000,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,631,751 | 32,792,636 |
kWh
|
$0.050 | |
Electricity Demand | $738,336 | 58,899 |
kW-mo/yr
|
$12.54 | |
Electricity Fees | $166,982 | - |
|
- | |
Natural Gas | $417,515 | 118,023 |
MMBtu
|
$3.54 | |
Waste Disposal Costs | |||||
Water Usage | $49,833 | 12,944 |
Tgal
|
$3.85 | |
TOTAL YEARLY COSTS | $3,004,417 | ||||
RECOMMENDED SAVINGS* | $57,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4314: Use synthetic lubricant | $16,984 | $11,275 |
$12,647
252,934
kWh
|
$4,337
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $12,515 | - | - | - |
$12,515
-
MMBtu
|
|
03 | 2.7221: Lower temperature during the winter season and vice-versa | $12,508 | - | - | - |
$12,508
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $11,685 | $1,659 |
$9,241
184,826
kWh
|
$2,444
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,267 | $2,345 |
$1,687
33,748
kWh
|
$579
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,959 | $3,900 |
$1,458
29,162
kWh
|
$501
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $57,918 | $19,179 |
$25,034
500,670
kWh
|
$7,861
-
kW-mo/yr
|
$25,023
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs