ITAC Assessment: OK0146
ITAC logo
ITAC Assessment: OK0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PIPELINE PARTS
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,330
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,067 1,065,944
kWh
Natural Gas $28,276 7,574
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,049

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $142 $525 - $142
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $176 $450 $176
4,396
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $28 - $28
586
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50 $46 $50
1,172
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $234 - $207
5,275
kWh
- $27
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,352 $13,552 $6,790
169,695
kWh
- $562
07 2.2511: Insulate bare equipment $1,971 $204 $1,702
42,497
kWh
$269
-
MMBtu
-
TOTAL RECOMMENDED $9,953 $14,777 $8,953
223,621
kWh
$411
-
MMBtu
$589
TOTAL IMPLEMENTED $2,049 $250 $1,780
44,255
kWh
$269
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs