Assessment Year | 2012 |
---|---|
Principal Product | Small air cooled gas powered engines |
NAICS | 333618: Other Engine Equipment Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 823 |
Plant Area |
308,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,686,985 | 40,392,000 |
kWh
|
$0.067 |
Electricity Fees | $1,346 | - |
|
- |
Natural Gas | $873,637 | 185,485 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $481,016 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,273 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $230,479 | $107,601 | - |
$230,479
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $106,168 | $10,690 | - |
$106,168
-
MMBtu
|
- | |
03 | 2.4226: Use / purchase optimum sized compressor | $60,715 | $105,000 |
$60,715
910,277
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $49,961 | $5,000 | - |
$51,311
-
MMBtu
|
$(-1,350.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $29,305 | $35,000 |
$29,305
437,384
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,968 | $450 |
$2,968
44,303
kWh
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $1,420 | $2,000 |
$1,420
21,200
kWh
|
- | - | |
TOTAL RECOMMENDED | $481,016 | $265,741 |
$94,408
1,413,164
kWh
|
$387,958
-
MMBtu
|
$(-1,350.0) | ||
TOTAL IMPLEMENTED | $32,273 | $35,450 |
$32,273
481,687
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs