Assessment Year | 2015 |
---|---|
Principal Product | Bread |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
200,000
ft2
|
Annual Production | 133,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $415,560 | 10,061,600 |
kWh
|
$0.041 |
Electricity Demand | $199,635 | 17,472 |
kW-mo/yr
|
$11.43 |
Natural Gas | $433,222 | 84,479 |
MMBtu
|
$5.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $163,560 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $26,361 | $500 |
$26,361
-
kWh
|
- | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $36,410 | $60,000 | - | - |
$36,410
-
MMBtu
|
- | - | |
03 | 2.1224: Replace boiler | $4,483 | $22,000 | - | - |
$4,483
-
MMBtu
|
- | - | |
04 | 2.2135: Repair and eliminate steam leaks | $1,795 | $1,000 | - | - |
$1,795
-
MMBtu
|
- | - | |
05 | 2.2113: Repair or replace steam traps | $7,862 | $5,500 | - | - |
$8,670
-
MMBtu
|
$(-208.0) | $(-600.0) | |
06 | 2.2437: Recover waste heat from equipment | $26,265 | $65,000 | - | - |
$26,265
-
MMBtu
|
- | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $15,935 | $40,000 |
$10,258
248,370
kWh
|
$5,677
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $19,847 | $4,550 |
$14,388
348,385
kWh
|
$5,459
-
kW-mo/yr
|
- | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,922 | $200 |
$6,585
159,453
kWh
|
$2,497
-
kW-mo/yr
|
- | $(-100.0) | $(-60.0) | |
10 | 2.4239: Eliminate or reduce compressed air usage | $2,410 | $1,500 |
$1,386
33,570
kWh
|
$1,024
-
kW-mo/yr
|
- | - | - | |
11 | 2.4239: Eliminate or reduce compressed air usage | $1,718 | $3,000 |
$642
15,543
kWh
|
$1,076
-
kW-mo/yr
|
- | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,188 | $3,275 |
$1,596
38,640
kWh
|
$631
-
kW-mo/yr
|
- | - | $(-39.0) | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,805 | $8,112 |
$2,807
67,973
kWh
|
$1,110
-
kW-mo/yr
|
- | - | $(-112.0) | |
14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $2,800 |
$488
11,826
kWh
|
- | - | - | - | |
15 | 2.7111: Reduce illumination to minimum necessary levels | $1,730 | $406 |
$985
23,839
kWh
|
$389
-
kW-mo/yr
|
- | - | $356 | |
16 | 2.7135: Install occupancy sensors | $401 | $347 |
$401
9,702
kWh
|
- | - | - | - | |
17 | 2.3132: Recharge batteries on during off-peak demand periods | $564 | $200 |
$311
-
kWh
|
$253
-
kW-mo/yr
|
- | - | - | |
18 | 2.4151: Develop a repair/replace policy | $1,939 | $4,256 |
$1,248
30,221
kWh
|
$691
-
kW-mo/yr
|
- | - | - | |
19 | 2.7224: Reduce space conditioning during non-working hours | $437 | $510 |
$437
10,590
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $163,560 | $223,156 |
$67,893
998,112
kWh
|
$18,807
-
kW-mo/yr
|
$77,623
-
MMBtu
|
$(-308.0) | $(-455.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs