ITAC Assessment: OK0139
ITAC logo
ITAC Assessment: OK0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product IRON CASTING
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area
n/a
Annual Production 2,400
ton
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,822 2,863,130
kWh
Natural Gas $27,827 7,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $90 $325 - $90
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $519 $115 $519
9,965
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $429 $130 $429
8,206
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $626 $135 $626
12,016
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $222 - - $222
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $52 $180 $52
1,465
kWh
-
TOTAL RECOMMENDED $1,938 $885 $1,626
31,652
kWh
$312
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs