ITAC Assessment: MS0274
ITAC logo
ITAC Assessment: MS0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Processed Meat
NAICS 311613: Rendering and Meat Byproduct Processing
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 56,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,716 3,444,480
kWh
Electricity Demand $66,705 6,754
kW-mo/yr
Electricity Fees $2,931 -
Natural Gas $125,382 16,569
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2447: Heat water with exhaust heat $35,536 $19,550 - - - $35,536
-
MMBtu
02 2.7124: Make a practice of turning off lights when not needed $8,485 $5,832 $8,360
238,919
kWh
- $125 -
03 2.2414: Use waste heat from hot flue gases to preheat $6,356 $15,064 - - - $6,356
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,508 $2,000 - - - $5,508
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $5,356 $94 - - - $5,356
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,129 $7,926 $2,854
81,556
kWh
$1,214
-
kW-mo/yr
$61 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,110 $2,387 $2,154
61,550
kWh
$911
-
kW-mo/yr
$45 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,342 $7,035 $1,592
45,489
kWh
$715
-
kW-mo/yr
$35 -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,636 $5,788 $2,597
74,231
kWh
- $39 -
10 2.7124: Make a practice of turning off lights when not needed $1,135 - $1,118
31,959
kWh
- $17 -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $672 $223 $661
18,901
kWh
- $11 -
12 2.7229: Air condition only space necessary $425 $120 $137
3,923
kWh
$282
-
kW-mo/yr
$6 -
TOTAL RECOMMENDED $75,690 $66,019 $19,473
556,528
kWh
$3,122
-
kW-mo/yr
$339 $52,756
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs