ITAC Assessment: OK0132
ITAC logo
ITAC Assessment: OK0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product OIL FIELD EQUIPMENT
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,324 239,742
kWh
Natural Gas $11,099 2,822
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $873 $597 - $873
-
MMBtu
02 2.6232: Install set-back timers $113 $597 $113
2,052
kWh
-
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $95 $85 $95
1,758
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $45 $84 $45
879
kWh
-
05 2.7261: Install timers and/or thermostats $84 $165 - $84
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $63 $114 $63
1,758
kWh
-
TOTAL RECOMMENDED $1,273 $1,642 $316
6,447
kWh
$957
-
MMBtu
TOTAL IMPLEMENTED $1,178 $1,557 $221
4,689
kWh
$957
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs