Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product OIL & GAS DRILLING PDTS.
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 2,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,355 4,859,906
kWh
Natural Gas $37,284 10,647
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,534 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $1,033 - $1,033
19,930
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $1,779 $1,482
28,722
kWh
-
03 2.7261: Install timers and/or thermostats $13,322 $100 - $13,322
-
MMBtu
04 2.3191: Use demand controller or load shedder $2,697 - - $2,697
-
MMBtu
TOTAL RECOMMENDED $18,534 $1,879 $2,515
48,652
kWh
$16,019
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs