ITAC Assessment: GT0835
ITAC logo
ITAC Assessment: GT0835
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product PVC Packaging Film
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $100
M
to 500
M
# of Employees 232
Plant Area 330,000
ft2
Annual Production 96,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,994,869 34,545,703
kWh
Natural Gas $284,551 13,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,531

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,131 $1,172 $3,131
56,724
kWh
-
02 2.2437: Recover waste heat from equipment $47,685 $32,900 $(-1,245.0)
(-22,561)
kWh
$48,930
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $14,548 $8,000 $14,548
263,549
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,400 $750 $1,400
25,303
kWh
-
TOTAL RECOMMENDED $66,764 $42,822 $17,834
323,015
kWh
$48,930
-
MMBtu
TOTAL IMPLEMENTED $4,531 $1,922 $4,531
82,027
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs