Assessment Year | 2004 |
---|---|
Principal Product | Electrostatic coatings |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 38 |
Plant Area |
98,600
ft2
|
Annual Production | 152,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,626 | 4,126,800 |
kWh
|
$0.042 |
Electricity Demand | $35,313 | 8,202 |
kW-mo/yr
|
$4.31 |
Electricity Fees | $55,021 | - |
|
- |
Natural Gas | $130,493 | 12,993 |
MMBtu
|
$10.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,105 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,928 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $11,003 | $10,413 | - | - | - |
$11,003
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,867 | $11,496 |
$4,279
128,385
kWh
|
$900
-
kW-mo/yr
|
$1,688 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,256 | $230 |
$2,412
72,377
kWh
|
- | $844 | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $2,835 | $4,800 | - | - | - |
$2,835
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $2,270 | $1,731 | - | - | - |
$2,270
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $535 | $125 |
$321
9,625
kWh
|
$84
-
kW-mo/yr
|
$130 | - | |
07 | 2.7261: Install timers and/or thermostats | $207 | $355 |
$153
4,602
kWh
|
- | $54 | - | |
08 | 2.7135: Install occupancy sensors | $132 | $346 |
$97
2,924
kWh
|
- | $35 | - | |
TOTAL RECOMMENDED | $27,105 | $29,496 |
$7,262
217,913
kWh
|
$984
-
kW-mo/yr
|
$2,751 |
$16,108
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,928 | $13,582 |
$7,012
210,387
kWh
|
$984
-
kW-mo/yr
|
$2,662 |
$2,270
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs