Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Electrostatic coatings
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 38
Plant Area 98,600
ft2
Annual Production 152,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,626 4,126,800
kWh
Electricity Demand $35,313 8,202
kW-mo/yr
Electricity Fees $55,021 -
Natural Gas $130,493 12,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,105 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,928

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7231: Use radiant heater for spot heating $11,003 $10,413 - - - $11,003
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,867 $11,496 $4,279
128,385
kWh
$900
-
kW-mo/yr
$1,688 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,256 $230 $2,412
72,377
kWh
- $844 -
04 2.2414: Use waste heat from hot flue gases to preheat $2,835 $4,800 - - - $2,835
-
MMBtu
05 2.2437: Recover waste heat from equipment $2,270 $1,731 - - - $2,270
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $535 $125 $321
9,625
kWh
$84
-
kW-mo/yr
$130 -
07 2.7261: Install timers and/or thermostats $207 $355 $153
4,602
kWh
- $54 -
08 2.7135: Install occupancy sensors $132 $346 $97
2,924
kWh
- $35 -
TOTAL RECOMMENDED $27,105 $29,496 $7,262
217,913
kWh
$984
-
kW-mo/yr
$2,751 $16,108
-
MMBtu
TOTAL IMPLEMENTED $12,928 $13,582 $7,012
210,387
kWh
$984
-
kW-mo/yr
$2,662 $2,270
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs