Assessment Year 1982
Principal Product CONCRETE AND ASPHALT
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 75,000
ton
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,238 410,317
kWh
Natural Gas $109,978 38,828
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $406 $294 $406
6,741
kWh
-
02 2.7261: Install timers and/or thermostats $436 $600 - $436
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $293 - $293
4,982
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $31,428 $18,000 - $31,428
-
MMBtu
05 2.2511: Insulate bare equipment $3,052 $5,840 - $3,052
-
MMBtu
06 2.2511: Insulate bare equipment $497 $202 - $497
-
MMBtu
07 2.2511: Insulate bare equipment $438 $254 - $438
-
MMBtu
08 2.2511: Insulate bare equipment $4,281 $2,495 - $4,281
-
MMBtu
TOTAL RECOMMENDED $40,831 $27,685 $699
11,723
kWh
$40,132
-
MMBtu
TOTAL IMPLEMENTED $436 $600 - $436
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs