ITAC Assessment: OK0071
ITAC logo
ITAC Assessment: OK0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product OILFIELD PRODUCTS
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 1,300
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,417 1,298,945
kWh
Natural Gas $49,270 14,608
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,933 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,264 $160 $1,264
45,721
kWh
-
02 2.7261: Install timers and/or thermostats $750 $351 - $750
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $436 $251 $436
9,379
kWh
-
04 2.6232: Install set-back timers $343 - $343
7,327
kWh
-
05 2.6232: Install set-back timers $140 - $140
4,982
kWh
-
TOTAL RECOMMENDED $2,933 $762 $2,183
67,409
kWh
$750
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs