ITAC Assessment: OK0052
ITAC logo
ITAC Assessment: OK0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product DRY TYPE AIR FILTERS
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,375,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,096 1,446,366
kWh
Natural Gas $58,053 17,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,959 $437 $2,959
51,583
kWh
-
02 2.7261: Install timers and/or thermostats $1,693 $485 - $1,693
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $711 $450 - $711
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,144 $83 $1,144
34,877
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $6,532 $3,355 - $6,532
-
MMBtu
06 2.7444: Close holes and openings in building such as broken windows $2,202 $64 - $2,202
-
MMBtu
07 2.7314: Reduce ventilation air $2,595 $600 - $2,595
-
MMBtu
TOTAL RECOMMENDED $17,836 $5,474 $4,103
86,460
kWh
$13,733
-
MMBtu
TOTAL IMPLEMENTED $5,039 $632 $1,144
34,877
kWh
$3,895
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs