ITAC Assessment: OK0050
ITAC logo
ITAC Assessment: OK0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product WINCHES, POWER TAKE-OFF
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $1
M
to 5
M
# of Employees 275
Plant Area
n/a
Annual Production 5,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,825 4,027,550
kWh
Natural Gas $25,000 8,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,699 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,801 $180 $7,801
283,411
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $187 $330 $187
6,741
kWh
-
03 2.2532: Use only amount of air necessary to prevent explosion hazard $199 $17 $34
1,172
kWh
$165
-
MMBtu
04 2.2532: Use only amount of air necessary to prevent explosion hazard $7,642 $80 $1,042
37,808
kWh
$6,600
-
MMBtu
05 2.7261: Install timers and/or thermostats $275 $790 - $275
-
MMBtu
06 2.5123: Reduce fluid flow rates $595 - $100
3,810
kWh
$495
-
MMBtu
TOTAL RECOMMENDED $16,699 $1,397 $9,164
332,942
kWh
$7,535
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs