ITAC Assessment: ME0134
ITAC logo
ITAC Assessment: ME0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Yachts
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 50,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,681 900,938
kWh
Fuel Oil #2 $52,320 10,464
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7135: Install occupancy sensors $300 $150 $300
2,638
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,500 $1,050 - $1,500
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,743 $400 - $2,743
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $598 $300 $598
5,569
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $546 $400 $546
4,982
kWh
-
TOTAL RECOMMENDED $5,687 $2,300 $1,444
13,189
kWh
$4,243
-
MMBtu
TOTAL IMPLEMENTED $3,641 $850 $898
8,207
kWh
$2,743
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs