| Assessment Year | 1994 |
|---|---|
| Principal Product | Yachts |
| NAICS |
n/a
|
| SIC | 3732: Boat Building and Repairing |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
50,000
ft2
|
| Annual Production | 15
pieces
|
| Production Hrs. Annual | 2,200
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $97,681 | 900,938 |
kWh
|
$0.11 |
| Fuel Oil #2 | $52,320 | 10,464 |
MMBtu
|
$5.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,641 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $300 | $150 |
$300
2,638
kWh
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,500 | $1,050 | - |
$1,500
-
MMBtu
|
|
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,743 | $400 | - |
$2,743
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $598 | $300 |
$598
5,569
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $546 | $400 |
$546
4,982
kWh
|
- | |
| TOTAL RECOMMENDED | $5,687 | $2,300 |
$1,444
13,189
kWh
|
$4,243
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,641 | $850 |
$898
8,207
kWh
|
$2,743
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs