ITAC Assessment: OK0048
ITAC logo
ITAC Assessment: OK0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ELECTRONIC EQUIPMENT
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $500
k
to 1
M
# of Employees 35
Plant Area
n/a
Annual Production 1,100
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,317 138,628
kWh
Natural Gas $3,662 1,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $398 $265 $398
7,913
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $126 $738 $126
2,638
kWh
-
03 2.7444: Close holes and openings in building such as broken windows $35 $17 - $35
-
MMBtu
04 2.7261: Install timers and/or thermostats $1,338 $400 - $1,338
-
MMBtu
TOTAL RECOMMENDED $1,897 $1,420 $524
10,551
kWh
$1,373
-
MMBtu
TOTAL IMPLEMENTED $35 $17 - $35
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs