Assessment Year | 1985 |
---|---|
Principal Product | CUSTOM PRINTED PRODUCTS |
NAICS |
n/a
|
SIC | 2761: Manifold Business Forms |
Sales Range | $5 M to 10M |
# of Employees | 112 |
Plant Area |
n/a
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,024
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,002 | 1,912,075 |
kWh
|
$0.065 |
Natural Gas | $11,398 | 2,652 |
MMBtu
|
$4.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,752 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,866 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,820 | $500 |
$1,820
27,843
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,280 | $4,700 |
$2,280
34,877
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,475 | $500 |
$1,475
22,567
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $287 | $100 |
$287
4,396
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,269 | $3,069 |
$5,269
80,598
kWh
|
- | |
06 | 2.7261: Install timers and/or thermostats | $1,808 | $650 |
$1,322
20,223
kWh
|
$486
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $2,050 | $600 |
$2,050
31,360
kWh
|
- | |
08 | 2.6124: Establish equipment maintenance schedule | $6,610 | $3,000 |
$6,610
101,114
kWh
|
- | |
09 | 2.6121: Reduce hot water temperature to the minimum required | $153 | - |
$153
2,345
kWh
|
- | |
TOTAL RECOMMENDED | $21,752 | $13,119 |
$21,266
325,323
kWh
|
$486
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,866 | $4,650 |
$11,380
174,092
kWh
|
$486
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs