ITAC Assessment: UF0284
ITAC logo
ITAC Assessment: UF0284
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Roofing Products
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 300,000
ft2
Annual Production 69,484
ton
Production Hrs. Annual 6,240
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,052 2,569,451
kWh
Electricity Demand $48,636 5,528
kW-mo/yr
Fuel Oil #2 $301,704 274,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,449

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,548 $9,647 $4,358
56,599
kWh
$1,190
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $17,357 $50 - - - $17,357
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $20,280 $49,350 $14,646
190,208
kWh
$6,124
-
kW-mo/yr
- $(-490.0)
04 2.4238: Do not use compressed air for personal cooling $6,860 $1,212 $6,860
71,454
kWh
- - -
05 2.4133: Use most efficient type of electric motors $6,066 $450 $5,266
69,406
kWh
$800
-
kW-mo/yr
- -
06 3.4155: Meter waste water $5,235 $1,500 - - $5,235
-
Tgal
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $645 $1,895 - - - $645
08 3.5316: Contract a wood pallet recycling company $1,485 - - - - $1,485
09 4.448: Install automatic part storage / retreval system $29,484 $5,113 - - - $29,484
10 4.431: Train operators for maximum operating efficiency $7,350 $800 - - - $7,350
TOTAL RECOMMENDED $100,310 $70,017 $31,130
387,667
kWh
$8,114
-
kW-mo/yr
$5,235
-
Tgal
$55,831
TOTAL IMPLEMENTED $20,449 $10,897 $9,624
126,005
kWh
$1,990
-
kW-mo/yr
- $8,835
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs