ITAC Assessment: LT0043
ITAC logo
ITAC Assessment: LT0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SAW BLADES
NAICS
n/a
SIC 3425: Saw Blades and Handsaws
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 14,500,000
pieces
Production Hrs. Annual 5,520
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $530,941 10,372,802
kWh
Natural Gas $46,955 11,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $338 - $338
7,620
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $901 $300 - $901
-
MMBtu
03 2.1122: Re-size charging openings or add a movable door on equipment $1,159 $200 - $1,159
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,294 $412 $2,294
44,842
kWh
-
05 2.7221: Lower temperature during the winter season and vice-versa $1,977 - $1,167
26,964
kWh
$810
-
MMBtu
06 2.1122: Re-size charging openings or add a movable door on equipment $402 $1,020 - $402
-
MMBtu
07 2.7224: Reduce space conditioning during non-working hours $662 - $662
15,240
kWh
-
TOTAL RECOMMENDED $7,733 $1,932 $4,461
94,666
kWh
$3,272
-
MMBtu
TOTAL IMPLEMENTED $5,354 $912 $3,294
67,702
kWh
$2,060
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs