ITAC Assessment: OK0024
ITAC logo
ITAC Assessment: OK0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product JOB SHOP, MACHINE TOOLS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 50
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,194 254,689
kWh
Natural Gas $14,139 5,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,135

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7292: Lower ceiling to reduce conditioned space $3,189 $16,389 - $3,189
-
MMBtu
02 2.7494: Install storm windows and doors $300 $566 - $300
-
MMBtu
03 2.7444: Close holes and openings in building such as broken windows $1,502 $3,500 - $1,502
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $85 $80 $85
1,758
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $2,135 - $2,135
130,715
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $386 $90 $386
6,155
kWh
-
TOTAL RECOMMENDED $7,597 $20,625 $2,606
138,628
kWh
$4,991
-
MMBtu
TOTAL IMPLEMENTED $2,135 - $2,135
130,715
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs