ITAC Assessment: GT0899
ITAC logo
ITAC Assessment: GT0899
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Canned tuna
NAICS 311710: Seafood Product Preparation and Packaging
SIC 2091: Canned and Cured Fish and Seafoods
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 6,360,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,073,891 13,734,551
kWh
Natural Gas $410,915 110,532
MMBtu
Waste Disposal Costs
Water Usage $41,143,445 13,315,031
Tgal
TOTAL YEARLY COSTS $42,628,251
RECOMMENDED SAVINGS* $400,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,167

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.1231: Establish burner maintenance schedule for boilers $108,707 $1,008 $8,602
110,282
kWh
$100,105
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $7,187 $1,000 $7,187
92,135
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $29,097 $4,967 $29,097
373,033
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $40,882 $10,400 $40,882
524,130
kWh
- -
05 2.7135: Install occupancy sensors $8,883 $9,708 $8,883
113,880
kWh
- -
06 3.4114: Replace city water with recycled water via cooling tower $205,713 $445,437 - - $205,713
-
Tgal
TOTAL RECOMMENDED $400,469 $472,520 $94,651
1,213,460
kWh
$100,105
-
MMBtu
$205,713
-
Tgal
TOTAL IMPLEMENTED $45,167 $15,675 $45,167
579,048
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs