Assessment Year | 2017 |
---|---|
Principal Product | Canned tuna |
NAICS | 311710: Seafood Product Preparation and Packaging |
SIC | 2091: Canned and Cured Fish and Seafoods |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
200,000
ft2
|
Annual Production | 6,360,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,073,891 | 13,734,551 |
kWh
|
$0.078 | |
Natural Gas | $410,915 | 110,532 |
MMBtu
|
$3.72 | |
Waste Disposal Costs | |||||
Water Usage | $41,143,445 | 13,315,031 |
Tgal
|
$3.09 | |
TOTAL YEARLY COSTS | $42,628,251 | ||||
RECOMMENDED SAVINGS* | $400,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $45,167 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|
01 | 2.1231: Establish burner maintenance schedule for boilers | $108,707 | $1,008 |
$8,602
110,282
kWh
|
$100,105
-
MMBtu
|
- | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $7,187 | $1,000 |
$7,187
92,135
kWh
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $29,097 | $4,967 |
$29,097
373,033
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $40,882 | $10,400 |
$40,882
524,130
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $8,883 | $9,708 |
$8,883
113,880
kWh
|
- | - | |
06 | 3.4114: Replace city water with recycled water via cooling tower | $205,713 | $445,437 | - | - |
$205,713
-
Tgal
|
|
TOTAL RECOMMENDED | $400,469 | $472,520 |
$94,651
1,213,460
kWh
|
$100,105
-
MMBtu
|
$205,713
-
Tgal
|
||
TOTAL IMPLEMENTED | $45,167 | $15,675 |
$45,167
579,048
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs