ITAC Assessment: OK0018
ITAC logo
ITAC Assessment: OK0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CUSTOM STEEL FABRICATION
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 400,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,048 2,184,642
kWh
Natural Gas $50,246 22,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,523

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,010 $9,000 $2,010
54,220
kWh
-
02 2.7261: Install timers and/or thermostats $594 $850 - $594
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $475 $241 $475
11,723
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $86 $32 $86
3,224
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $358 $158 $73
2,052
kWh
$285
-
MMBtu
TOTAL RECOMMENDED $3,523 $10,281 $2,644
71,219
kWh
$879
-
MMBtu
TOTAL IMPLEMENTED $3,523 $10,281 $2,644
71,219
kWh
$879
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs