ITAC Assessment: BD0478
ITAC logo
ITAC Assessment: BD0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Printed paper goods
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 60,000
ft2
Annual Production 1,400,000
lb
Production Hrs. Annual 4,400
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,444 1,321,324
kWh
Electricity Demand $47,349 5,127
kW-mo/yr
Electricity Fees $420 -
Natural Gas $11,808 1,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,978 $3,229 $3,953
37,715
kWh
$1,025
-
kW-mo/yr
- - - -
02 2.7221: Lower temperature during the winter season and vice-versa $2,345 $15 - - $2,345
-
MMBtu
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,961 $15 $1,581
15,085
kWh
$380
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,217 $1,000 $981
9,361
kWh
$236
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,111 $575 $733
6,991
kWh
$89
-
kW-mo/yr
- $121 $168 -
06 2.4221: Install compressor air intakes in coolest locations $784 $900 $658
6,278
kWh
$126
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $751 $450 $552
5,266
kWh
$199
-
kW-mo/yr
- - - -
08 4.513: Re-arrange equipment layout to reduce labor costs $13,019 $7,560 - - - $360 - $12,659
TOTAL RECOMMENDED $26,166 $13,744 $8,458
80,696
kWh
$2,055
-
kW-mo/yr
$2,345
-
MMBtu
$481 $168 $12,659
TOTAL IMPLEMENTED $21,959 $12,704 $7,173
68,439
kWh
$1,767
-
kW-mo/yr
- $360 - $12,659
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs