ITAC Assessment: OD0122
ITAC logo
ITAC Assessment: OD0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Printed Material
NAICS
n/a
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 31,500
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,772 785,170
kWh
Electricity Demand $11,611 2,234
kW-mo/yr
Electricity Fees $5,461 -
Natural Gas $1,691 167
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,564 $3,171 $15,899
298,945
kWh
$2,665
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $2,277 $150 $1,979
37,222
kWh
$298
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $932 $200 $932
16,999
kWh
- -
04 2.6214: Shut off pilots in standby equipment $248 $20 - - $248
-
MMBtu
05 2.7444: Close holes and openings in building such as broken windows $1,545 $93 $1,545
29,015
kWh
- -
06 2.7261: Install timers and/or thermostats $2,871 $1,050 $2,871
53,927
kWh
- -
TOTAL RECOMMENDED $26,437 $4,684 $23,226
436,108
kWh
$2,963
-
kW-mo/yr
$248
-
MMBtu
TOTAL IMPLEMENTED $4,416 $1,143 $4,416
82,942
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs